Cockburn Calrossie Combined Sewer Relief Works Contract 12

Cockburn Calrossie Combined Sewer Relief Works Contract 5A

On this project J-CON's scope of work consisted of the modification of the 1950mm combined sewer located the intersection of Harrow and Taylor Ave. This included the construction of a large temporary shored shaft excavation, temporary flow control, as well as the supply and installation of a large precast structure.

Ferry Road and Riverbend Combined Sewer Relief Contract 5 East Stage 1

J-CON performed this contract during the winter of 2016/2017 valued at approximately $1.9 million for the City of Winnipeg. Major components of work include:
  • Construction of land drainage sewers ranging in size from 750mm to 1050mm diameter, by trenchless and open cut methods.
  • Construction of a 1200mm diameter outfall into the Assiniboine River at Jae Eadie Park.
  • Installation of new connections to existing catch basin and catch basin leads to new Land Drainage Sewer, abandonment of existing catch basin leads to combined sewers, and replacement of deteriorated catch basins.

North Kildonan Feedermain Connections and Valve Chambers

In 2016 J-CON completed this project valued at approximately $1 million for the City of Winnipeg. Project highlights included two cast in place concrete chambers and 24" water transmission piping in HDPE, PVC, Fusion coated steel, Ductile Iron, and PCCP materials. All major components of work were self performed in-house by J-CON including all structural concrete, excavation/backfill, mechanical works within the chambers and surface restoration.