Ferry Road and Riverbend Combined Sewer Relief Contract 5 East Stage 1

J-CON is currently performing this project valued at approximately $1.9 million for the City of Winnipeg. Major components of work include:
  • Construction of land drainage sewers ranging in size from 750mm to 1050mm diameter, by trenchless and open cut methods.
  • Construction of a 1200mm diameter outfall into the Assiniboine River at Jae Eadie Park.
  • Installation of new connections to existing catch basin and catch basin leads to new Land Drainage Sewer, abandonment of existing catch basin leads to combined sewers, and replacement of deteriorated catch basins.

North Kildonan Feedermain Connections and Valve Chambers

In 2016 J-CON completed this project valued at approximately $1 million for the City of Winnipeg. Project highlights included two cast in place concrete chambers and 24" water transmission piping in HDPE, PVC, Fusion coated steel, Ductile Iron, and PCCP materials. All major components of work were self performed in-house by J-CON including all structural concrete, excavation/backfill, mechanical works within the chambers and surface restoration.

 

17 Wing Airforce Base Watermain Renewal

J-CON was contracted by Defence Construction Canada to complete this project valued at approximately $600,000 to upgrade and renew existing Watermain and Valves.

Fountain Tire Storm Sewer

J-Con Civil Ltd. performed the following work for the construction of the Fountain Tire on Inksbrook Boulevard in Winnipeg:

  • Installation of 5 Catch Basins
  • 350 lineal meters of storm sewer piping
  • Tie into existing 750mm City of Winnipeg Storm Main
  • Trenchless road crossing under Inksbrook with no traffic interruption

Brady Landfill Gas Collection System

J-CON completed the following works at the Brady Landfill valued at approximately $1.2 million:

  • Supply and Install 2400mm Condensate Pumping Chamber, Yard Piping and Tie In to Existing Leachate System.
  • Construction of 42 well head assemblies.
  • Installation of sublateral piping using open cut and trenchless installation methods.
  • Construction of 9 Pumped Condensate Drain Traps.

Aquatic Harvesting Stormwater Retention Basins

J-CON provides Aquatic Vegetation Removal in Stormwater Retention Basins for The City of Winnipeg.

Environmental compliance and safety is of paramount importance in any of our undertakings. On projects such as this where we perform work in water or other environmentally sensitive areas, these focuses become even more intensified.